Ramboll's unique use of indicator-derived evaluation tools confirmed the feasibility of using innovative techniques to identify functional solutions to existing operational and scheduling challenges of Finland’s busiest and most important railway yard.
Docklands Light Railway has expanded its network to carry three car trains.
A new three-car DLR station built on-line around the existing Stratford line between All Saints and Devon's Road station, Langdon Park is central to regeneration plans for the area and was substantially funded by regional development monies. Ramboll acted as lead consultant for Costain, who carried out the project under a design & build contract.
Ramboll Smart Mobility conducted pedestrian modelling and transport planning and design services for the new Singapore-Kuala Lumpur High Speed Rail (HSR) terminus in Jurong East
York Engineers' Triangle is the UK's largest rail operating centre and was built above the well-preserved foundations of three roundhouse and a Victorian engine shed. Ramboll archaeologists and structural engineers preserved 95% of the archaeological remains.
The new Paddington station serves the new Elizabeth line railway (formerly known as Crossrail) which increases capacity at this major London interchange and across the network by 200m passengers a year. The Ramboll team played an integral role in the design and delivery of the entrance canopy, façades, cladding, conservation and public realm, working extensively with stakeholders to overcome the highly complex challenges of this landmark station.
Custom House Station is one of the 10 new stations in London for the Elizabeth line that was opened on the 24 May 2022. It is the only above-ground station on the line, which is positioned on a tightly constrained site. The new station is predominantly constructed in pre-cast concrete elements, where Ramboll supported the design in enhancing its buildability and project managed the contractor's design team, overseeing 12 separate design disciplines.