Holstebro-Struer CHP plant

Holstebro-Struer CHP Plant

Holstebro-Struer CHP Plant

Contact

Tina Kramer Kristensen

Tina Kramer Kristensen

Global Spearhead Director, Energy Systems
T: +45 51618184

Services we provided

Holstebro-Struer CHP Plant was built as a consequence of the Danish Government’s decision to increase decentralised combined heat and power production.

Heat and power is produced at Holstebro-Struer CHP plant by means of inland fuel such as waste, straw, wood chips and bio gas. The plant is the first of its kind with this fuel mix.

Ramboll's services included:

  • Feasibility studies
  • Risk and PPP assessment
  • Conceptual design and layout of the plant
  • Preparation of tender documents for the facility
  • Procurement management
  • Tender evaluation and contract negotiations
  • Project and contract management
  • Detail design of the complete building and infrastructure
  • Detail design of fuel system
  • Detail design of administration system
  • Supervision during construction and commissioning
  • Project follow-up

Technical Data:

Power: 30 MW
Heat: 68 MJ/s
Annual heat production: 1,600 TJ
Annual fuel consumption:

  • Waste approx. 135,000 t
  • Straw approx. 50,000 t
  • Wood chips approx. 18,000 t
  • Natural gas approx. 7 million Nm3

Ramboll

Ramboll
240 Blackfriars Road
London SE1 8NW
United Kingdom
Tel:+44 20 7631 5291
Fax:+44 845 299 1610

Mail: london@ramboll.co.uk

Company registration

Company registration

Ramboll UK Limited. Registered in England & Wales. Company registration no. 03659970. Registered office: 240 Blackfriars Road, London SE1 8NW


Other sites

Other sites